(a) |
STRUCTURE |
: |
Reinforced Concrete Frame |
(b) |
WALLS |
: |
Reinforced Concrete/Bricks |
(c) |
ROOFING |
: |
Reinforced Concrete Slab/Metal Roof Decking |
(d) |
ROOF |
: |
Reinforced Concrete Structure |
(e) |
CEILING FINISHES |
: |
|
|
Living/Dining |
- |
Skim Coating |
|
Bedrooms |
- |
Skim Coating |
|
Bathrooms |
- |
Fibre Plaster Ceiling |
|
Other Areas |
- |
Skim Coating |
(f) |
WINDOWS |
: |
Aluminium Framed Windows |
(g) |
DOORS |
: |
Timber Door/Timber Flush Door |
(h) |
LOCKS |
: |
General Quality Locksets |
(i) |
DECORATION |
: |
Not Applicable |
(j) |
FLOOR FINISHES |
: |
|
|
Living /Dining Area |
- |
Ceramic Tiles/Homogenous Tiles |
|
Bedrooms |
- |
Ceramic Tiles/Homogenous Tiles |
|
Bathrooms/Kitchen |
- |
Ceramic Tiles |
|
Foyer/Yard/Balcony |
- |
Ceramic Tiles |
|
Other Areas |
- |
Cement Render |
(k) |
WALL FINISHES |
: |
|
|
Toilets |
- |
Wall Tiles to Ceiling Height |
|
Kitchen |
- |
Wall Tiles to 1.5m ht |
|
Other Areas |
- |
Cement & Sand Plaster/Skim Coating with Paint |
(l) |
SANITARY INSTALLATION |
: |
|
|
|
|
|
Unit Types |
|
A/A1 |
B/B1 |
|
Water Closet |
|
2 nos. |
2 nos. |
|
Wash Basin |
|
2 nos. |
2 nos. |
|
Shower Point |
|
2 nos. |
2 nos. |
|
Kitchen Sink |
|
1 nos. |
1 nos. |
|
Bib Tap |
|
3 nos. |
3 nos. |
|
Paper Roll Holder |
|
2 nos. |
2 nos. |
(m) |
ELECTRICAL INSTALLATION |
: |
|
|
|
|
|
Unit Types |
|
A/A1 |
B/B1 |
|
Lighting Points |
|
11 nos. |
14 nos. |
|
Ceiling Fan Points |
|
3 nos. |
4 nos. |
|
13A Switched Socket Outlet |
|
11 nos. |
13 nos. |
|
Air Cond. Power Points |
|
3 nos. |
4 nos. |
|
Water Heater Points |
|
2 nos. |
2 nos. |
|
Door Bell & Chimc Points |
|
1 nos. |
1 nos. |
|
S.M.A.T.V. Points |
|
2 nos. |
2 nos. |
|
Telephone Points |
|
2 nos. |
2 nos. |
|
Fibre Wall Socket |
|
1 nos. |
1 nos. |
|
|
|
|
|
(n) |
FENCING |
: |
Not Applicable |
(o) |
TURFING |
: |
Not Applicable |
(p) |
GAS PIPING |
: |
Not Applicable |
(q) |
INTERNAL TELEPHONE TRUNKING |
: |
Concealed Conduit |
All drawings are subject to variation, modification & substitution as recommended by the Architect and/or directed by the Appropriate Authority.